Electrical planned with the build, not after it
Panel sizing, rough-in, inspection and finish wiring for a new home or garage, planned with you before the walls go up.
New Construction Electrical Services
As a new construction electrician in Duluth, Heyday Home Solutions sizes the panel, runs the rough-in, gets it inspected and wires the finish for a new home or garage. Cory Hesselgrave, our electrician, does the work. We've built new homes in Superior and a townhouse in Duluth's Coffee Creek neighborhood. Call (715) 817-2419 or ask for a free quote.
What is involved
We go through the plans with you, room by room, and size the panel for the house plus what you may add later: an EV charger, a sauna, a shop.
for the build, if the site needs it.
Once the framing is up, boxes go in and wire runs through the studs to every outlet, switch, light and appliance.
before insulation and drywall cover anything.
After paint, devices, fixtures and covers go in and the panel is labeled.
then power on.

Recent project
On Ohio Avenue in Superior's Billings Park neighborhood, we built three new one-level homes side by side. See the Ohio Avenue homes. In Coffee Creek, Duluth, we built a new townhouse after major lot prep and backfill to stabilize the site. See the Coffee Creek townhouse.
Cost
The size of the house, the panel and the number of circuits set the base. Lighting plans move it the most after that: a few ceiling fixtures cost far less than recessed cans in every room, under-cabinet lights and outdoor lighting. Planning for the future adds a little now and saves a lot later. A spare conduit to the garage or a 240-volt line for a future charger is cheap while the walls are open.
Signs it is time
Electrical rough-in happens after the framing, roofing and windows are in, and before insulation and drywall. Plumbing and heating rough-in usually go around the same time. The inspector looks at the box placement and heights, the wire sizes and types, how the cables are stapled and protected through the studs, and the panel's breakers and grounding. Nothing gets covered until that inspection passes. This is also your last cheap chance to move an outlet or add a light, so walk the house with us at rough-in. Moving a box in open studs takes minutes. After drywall, it's a patch and paint job.

The Heyday experience
Two things we help with before the work starts: paying for it over time, and getting an insurance claim through to a finished repair.
Financing runs through Acorn. You answer a few questions, compare loan offers from several lenders in one place, and apply with the one you choose. The loan is between you and that lender: we don’t issue it, and Acorn doesn’t pay us.
After storm or water damage, call your insurer first so they can assign an adjuster. Once the area is dried out and safe, we assess everything that needs rebuilding, including damage that only shows after cleanup, and write the estimate in the format adjusters work from. Their questions, any supplements and the approvals go through us. Then we schedule the rebuild.
What clients say
We had a very good experience with Heyday. They completely gutted and remodeled our master bathroom. I loved working with Amanda on the planning.
The crew at Heyday did a fantastic job on our new roof! The cleanup afterwards was impeccable, and the communication from management was top-notch!
Josh and his crew are terrific. The quality of their work is first rate - whether it be new construction or repair work or trouble shooting.
At planning, ideally, to size the service and lay out the rooms. On site, the rough-in starts once the framing is up and the house is closed in from the weather, before insulation. The finish comes after drywall and paint. Getting the electrician involved at the plans stage avoids moving boxes later.
Most new homes get a 200-amp service. A larger home with electric heat, an EV charger, a sauna or a shop may need more. We size it from a load calculation on your actual plans and add room for what you've said you'll add later, so the panel isn't full on day one.
Yes, and a new build is the cheapest time to do it. We can size the panel for it and run the wire or an empty conduit to the spot now, then add the charger or tub circuit when you're ready. Opening finished walls later costs far more than a run of wire today.
We plan the electrical with you before work starts and explain the options room by room. Cory Hesselgrave, our electrician, does the wiring. We show up when we say we will, communicate clearly through the build and treat the site with care. Grant Gilbertson does our estimates.
Your project
We will look at the space with you, listen to what you want, and explain your options before anything is decided.