Warm, water-safe floors underfoot
A bathroom floor that stays flat, dry and warm underfoot: the subfloor fixed first, then tile or luxury vinyl laid to last.
Bathroom Flooring Installation Services
Bathroom flooring in Duluth, MN starts below the surface: the subfloor repaired, a moisture barrier down, then tile or luxury vinyl installed and sealed at the tub, shower and toilet. A bathroom floor fails from underneath, so that's where we start. Call (715) 817-2419 or request a consultation.
What is involved
The toilet comes out so the new floor runs under it, not around it.
We look for soft spots by the toilet and tub, where leaks start. Rotted sections get cut out and replaced.
Tile needs a stiff floor or it cracks. Vinyl needs a flat one or every dip shows.
Under tile, a membrane. Under vinyl, the right underlayment for a wet room.
Tile set and grouted, or vinyl planks clicked together with their edges sealed at the tub and shower.
Toilet back on a new wax ring, trim and caulk.
Recent project
From a Google review by Shari Lundy: "They had to gut our bathroom and completely start from below the floor and moved a window." A soft bathroom floor can turn into that kind of job. Once the floor is open, we fix what's under it.
Cost
Luxury vinyl usually costs less to install than tile, because it goes down faster and needs no grout or cure time. Tile costs more in labor but lasts longer and handles standing water better. On either one, the subfloor is the wild card: replacing rotted sections adds labor and material. Floor heat adds the mat or cable and the wiring.
Signs it is time
A soft spot is the urgent one. It means the subfloor has been wet, and it gets worse with each leak.
A heated floor runs a thin mat or cable under tile, on its own thermostat. On a January morning in Duluth, it's the difference between a cold tile floor and a warm one. It goes in during the flooring job, between the subfloor and the tile, and it needs its own circuit. Cory Hesselgrave, the electrician on our crew, can wire it. Heat works best under tile or stone; most vinyl has limits on how warm it can run.
Recent work

The Heyday experience
Two things we help with before the work starts: paying for it over time, and getting an insurance claim through to a finished repair.
Financing runs through Acorn. You answer a few questions, compare loan offers from several lenders in one place, and apply with the one you choose. The loan is between you and that lender: we don’t issue it, and Acorn doesn’t pay us.
After storm or water damage, call your insurer first so they can assign an adjuster. Once the area is dried out and safe, we assess everything that needs rebuilding, including damage that only shows after cleanup, and write the estimate in the format adjusters work from. Their questions, any supplements and the approvals go through us. Then we schedule the rebuild.
What clients say
We had a very good experience with Heyday. They completely gutted and remodeled our master bathroom. I loved working with Amanda on the planning.
The crew at Heyday did a fantastic job on our new roof! The cleanup afterwards was impeccable, and the communication from management was top-notch!
Josh and his crew are terrific. The quality of their work is first rate - whether it be new construction or repair work or trouble shooting.
Tile handles standing water best and lasts the longest, and it's the floor for heat. Luxury vinyl is warmer underfoot without heat, softer if something drops, and quicker to install. In a kids' bathroom or a basement bath, vinyl is often the practical pick.
Yes. The toilet comes out and goes back on a new wax ring, and the vanity usually stays in place. The new floor meets it neatly at the base. If the vanity is coming out within a year or two, do it first, so the floor runs under the new one.
Sometimes. Vinyl can go over a flat, solid floor. Tile shouldn't go over vinyl, and we don't lay anything over a floor that's soft or moving. Each layer also raises the floor at the doorway and the toilet. We check what's there at the estimate.
No, but you'll be without that bathroom while the toilet is out. If it's your only bathroom, tell us at the estimate so we can plan around it.
Your project
We will look at the space with you, listen to what you want, and explain your options before anything is decided.